curtis

Book a demo

Unlock project data, reduce mistakes and rework.

Curtis helps construction managers find answers instantly to make the right decisions, avoid rework, and move projects forward.

Book a demo

42-007 - Titan Data Hub

Basement Structural Drawings for Construction

What are the compaction requirements for Granular A and B under footings and slabs

  • Granular A: 100% Standard Proctor Maximum Dry Density (SPMDD)
  • Granular B Type I: 98% SPMDD

Structural-Drawings-IFC-4-13-2022.pdf

Page 1

Architectural drawings C1.2

Page 5

When do we need to sawcut the slab-on-grade?

  • Sawcutting must occur within 8–16 hours after placement. This applies to all slabs unless noted otherwise.  

Ask Curtis anything...

Your sidekick in the field (and in the office)

Curtis takes care of the busywork, so you can focus on the fieldwork.

Curtis asks
Curtis understands your construction documents, retrieves information and answer project questions.

Curtis understands your project documents and gives you answers instantly. Curtis brings you the information you need instantly, so you can make the right decision.

Find me the issued for construction structural drawings for the basement

Thinking

I have reviewed the files with structural references, focused on gathering details about the basement and its specifications, and synthesized my findings along with the relevant documents.

Structural-Drawings-IFC-4-13-2022.pdf

Page 1

Architectural drawings C1.2

Page 5

Ask Curtis anything...

Documents

Curtis LOGS
Curtis captures your day as fast as it happens.

Make Curtis your additional eyes and ears. Record site activity using voice, photos, or short notes. Curtis turns your inputs into polished daily logs, RFIs, complete with timestamps, and detailed descriptions.

 

With Curtis, you don’t have to stay after hours to transcribe or copy + paste notes.

Oct 4, 2025

Site logs

42-007 - Titan Data Hub

Windsor, ON

🌥️ Partly cloudy, 5-12°C

Equipment

Type

Dozer

Model

D6

Qty

1

Type

Mini excavator

Model

Komatsu PC30

Qty

2

RFI

Please confirm the maximum allowable lift thickness for placing imported fill materials, and specify the required frequency of compaction testing (e.g., tests per lift, area coverage, or volume)

Topics

Topic

ESC

On-site

ESC measures in place and functioning. No visible sediment discharge offsite.

Inspector comments

Add

Submit draft

Personnel (0)

Name

Vlad Guerrero

On-site

Yes

Hours

5

Type

Regional Inspector

Name

Bo Bichette

On-site

Yes

Hours

7

Type

Regional Inspector

Labour

Copy from yesterday

Labour

1

Operator

8

Foreman

1

Site Activities

Add

General

Is a workday

Yes

Contractor

General Electrician

Subcontractor

-

Additional work

Add

Ask Curtis to do anything

RFI

Personnel

Equipment

Comments

Hey Curtis, add an RFI to confirm the required maximum lift thickness when placing imported fill materials, as well as the required frequency of compaction testing such as the number of tests per lift, area coverage, or material volume, so on.

curtis WORKFLOWS
Tell Curtis what needs to happen. It handles the rest.

Describe a workflow in your own words and Curtis turns it into tasks, checklists, reminders, and updates. It quietly manages the orchestration in the background, so you’re not pushing progress through email chains or manual follow-ups.

Generate draft invoice

Include quantities. Assign cost codes.

PM review

Confirms quantities. Reviews cost codes. Adds notes or corrections.

General invoice package

Draft email, attach progress certificate and supporting documentation

Send to client for submission

Draft email, attach supporting documentation

Invoice approved

Log deficiency

Photo, location, description, trade

Group similar tasks

Electrical, drywall, mechanical, plumbing.

Generate tasks per trade

Pull in all linked deficiencies. Attach photos + notes

Assign and notify trades

Notify trade lead, provide task list via email or SMS.

Generate walk through list

Electrical, drywall, mechanical, plumbing.

Close task

Resolve?

Create a workflow for logging and resolving deficiencies

Who we’re for

Curtis is built for ambitious builders.

Curtis is for builders who demand better than “that’s the way it’s always been.”

General contractors

Consulting engineers

Construction manager

Custom home builders

Save time. Build better.

With Curtis in your back pocket.

Book a demo

curtis

© Curtis

2025

All Rights Reserved

curtis

Book a demo

Unlock project data, reduce mistakes and rework.

Curtis helps construction managers find answers instantly to make the right decisions, avoid rework, and move projects forward.

Book a demo

Windsurf Construction

Ask Curtis

Projects

curtis

42-007 - Titan Data Hub

Basement Structural Drawings for Construction

What are the compaction requirements for Granular A and B under footings and slabs

  • Granular A: 100% Standard Proctor Maximum Dry Density (SPMDD)
  • Granular B Type I: 98% SPMDD

Structural-Drawings-IFC-4-13-2022.pdf

Page 1

Architectural drawings C1.2

Page 5

When do we need to sawcut the slab-on-grade?

  • Sawcutting must occur within 8–16 hours after placement. This applies to all slabs unless noted otherwise.  

Ask Curtis anything...

Searching 5,424 documents

Your sidekick in the field (and in the office)

Curtis takes care of the busywork, so you can focus on the fieldwork.

Curtis asks
Curtis understands your construction documents, retrieves information and answer project questions.

Curtis understands your project documents and gives you answers instantly. Curtis brings you the information you need instantly, so you can make the right decision.

Find me the issued for construction structural drawings for the basement

Thinking

I have reviewed the files with structural references, focused on gathering details about the basement and its specifications, and synthesized my findings along with the relevant documents.

Structural-Drawings-IFC-4-13-2022.pdf

Page 1

Architectural drawings C1.2

Page 5

Ask Curtis anything...

Documents

Curtis LOGS
Curtis captures your day as fast as it happens.

Make Curtis your additional eyes and ears. Record site activity using voice, photos, or short notes. Curtis turns your inputs into polished daily logs, RFIs, complete with timestamps, and detailed descriptions.

 

With Curtis, you don’t have to stay after hours to transcribe or copy + paste notes.

Oct 4, 2025

Site logs

42-007 - Titan Data Hub

Windsor, ON

🌥️ Partly cloudy, 5-12°C

Equipment

Type

Dozer

Model

D6

Qty

1

Type

Mini excavator

Model

Komatsu PC30

Qty

2

RFI

Please confirm the maximum allowable lift thickness for placing imported fill materials, and specify the required frequency of compaction testing (e.g., tests per lift, area coverage, or volume)

Topics

Topic

ESC

On-site

ESC measures in place and functioning. No visible sediment discharge offsite.

Inspector comments

Add

Submit draft

Personnel (0)

Name

Vlad Guerrero

On-site

Yes

Hours

5

Type

Regional Inspector

Name

Bo Bichette

On-site

Yes

Hours

7

Type

Regional Inspector

Labour

Copy from yesterday

Labour

1

Operator

8

Foreman

1

Site Activities

Add

General

Is a workday

Yes

Contractor

General Electrician

Subcontractor

-

Additional work

Add

Ask Curtis to do anything

RFI

Personnel

Equipment

Comments

Oct 11, 2025 @ 12:45pm Oakville, ON

Identified:

CAT D6 Dozer x 1

Hey Curtis, add an RFI to confirm the required maximum lift thickness when placing imported fill materials, as well as the required frequency of compaction testing such as the number of tests per lift, area coverage, or material volume, so on.

curtis WORKFLOWS
Tell Curtis what needs to happen. It handles the rest.

Describe a workflow in your own words and Curtis turns it into tasks, checklists, reminders, and updates. It quietly manages the orchestration in the background, so you’re not pushing progress through email chains or manual follow-ups.

Generate draft invoice

Include quantities. Assign cost codes.

PM review

Confirms quantities. Reviews cost codes. Adds notes or corrections.

General invoice package

Draft email, attach progress certificate and supporting documentation

Send to client for submission

Draft email, attach supporting documentation

Invoice approved

Log deficiency

Photo, location, description, trade

Group similar tasks

Electrical, drywall, mechanical, plumbing.

Generate tasks per trade

Pull in all linked deficiencies. Attach photos + notes

Assign and notify trades

Notify trade lead, provide task list via email or SMS.

Generate walk through list

Electrical, drywall, mechanical, plumbing.

Close task

Resolve?

Create a workflow for logging and resolving deficiencies

Who we’re for

Curtis is built for ambitious builders.

Curtis is for builders who demand better than “that’s the way it’s always been.”

General contractors

Consulting engineers

Construction manager

Custom home builders

Save time. Build better.

With Curtis in your back pocket.

Book a demo

curtis

© Curtis

2025

All Rights Reserved

curtis

Book a demo

Unlock project data, reduce mistakes and rework.

Curtis helps construction managers find answers instantly to make the right decisions, avoid rework, and move projects forward.

Book a demo

Windsurf Construction

Ask Curtis

Projects

curtis

42-007 - Titan Data Hub

Basement Structural Drawings for Construction

What are the compaction requirements for Granular A and B under footings and slabs

  • Granular A: 100% Standard Proctor Maximum Dry Density (SPMDD)
  • Granular B Type I: 98% SPMDD

Structural-Drawings-IFC-4-13-2022.pdf

Page 1

Architectural drawings C1.2

Page 5

When do we need to sawcut the slab-on-grade?

  • Sawcutting must occur within 8–16 hours after placement. This applies to all slabs unless noted otherwise.  

Ask Curtis anything...

Searching 5,424 documents

Your sidekick in the field (and in the office)

Curtis takes care of the busywork, so you can focus on the fieldwork.

Find me the issued for construction structural drawings for the basement

Thinking

I have reviewed the files with structural references, focused on gathering details about the basement and its specifications, and synthesized my findings along with the relevant documents.

Structural-Drawings-IFC-4-13-2022.pdf

Page 1

Architectural drawings C1.2

Page 5

Ask Curtis anything...

Documents

Curtis asks
Curtis understands your construction documents, retrieves information and answer project questions.

Curtis understands your project documents and gives you answers instantly. Curtis brings you the information you need instantly, so you can make the right decision.

Curtis LOGS
Curtis captures your day as fast as it happens.

Make Curtis your additional eyes and ears. Record site activity using voice, photos, or short notes. Curtis turns your inputs into polished daily logs, RFIs, complete with timestamps, and detailed descriptions.

 

With Curtis, you don’t have to stay after hours to transcribe or copy + paste notes.

Oct 4, 2025

Site logs

42-007 - Titan Data Hub

Windsor, ON

🌥️ Partly cloudy, 5-12°C

Equipment

Type

Dozer

Model

D6

Qty

1

Type

Mini excavator

Model

Komatsu PC30

Qty

2

RFI

Please confirm the maximum allowable lift thickness for placing imported fill materials, and specify the required frequency of compaction testing (e.g., tests per lift, area coverage, or volume)

Topics

Topic

ESC

On-site

ESC measures in place and functioning. No visible sediment discharge offsite.

Inspector comments

Add

Submit draft

Personnel (0)

Name

Vlad Guerrero

On-site

Yes

Hours

5

Type

Regional Inspector

Name

Bo Bichette

On-site

Yes

Hours

7

Type

Regional Inspector

Labour

Copy from yesterday

Labour

1

Operator

8

Foreman

1

Site Activities

Add

General

Is a workday

Yes

Contractor

General Electrician

Subcontractor

-

Additional work

Add

Ask Curtis to do anything

RFI

Personnel

Equipment

Comments

Oct 11, 2025 @ 12:45pm Oakville, ON

Identified:

CAT D6 Dozer x 1

Hey Curtis, add an RFI to confirm the required maximum lift thickness when placing imported fill materials, as well as the required frequency of compaction testing such as the number of tests per lift, area coverage, or material volume, so on.

Generate draft invoice

Include quantities. Assign cost codes.

PM review

Confirms quantities. Reviews cost codes. Adds notes or corrections.

General invoice package

Draft email, attach progress certificate and supporting documentation

Send to client for submission

Draft email, attach supporting documentation

Invoice approved

Log deficiency

Photo, location, description, trade

Group similar tasks

Electrical, drywall, mechanical, plumbing.

Generate tasks per trade

Pull in all linked deficiencies. Attach photos + notes

Assign and notify trades

Notify trade lead, provide task list via email or SMS.

Generate walk through list

Electrical, drywall, mechanical, plumbing.

Close task

Resolve?

Create a workflow for logging and resolving deficiencies

curtis WORKFLOWS
Tell Curtis what needs to happen. It handles the rest.

Describe a workflow in your own words and Curtis turns it into tasks, checklists, reminders, and updates. It quietly manages the orchestration in the background, so you’re not pushing progress through email chains or manual follow-ups.

Who we’re for

Curtis is built for ambitious builders.

Curtis is for builders who demand better than “that’s the way it’s always been.”

General contractors

Consulting engineers

Construction manager

Custom home builders

Save time. Build better.

With Curtis in your back pocket.

Book a demo